9 APRIL 2010
I met Mr. Ir. Sulaiman Bin Kamari (Jurutera Mekanikal Kanan) and he gave me an Industrial Training schedule. Referring to my Industrial Training schedule, i will be learning 4 scopes of mechanical work which are Lift System, Fire Fighting System, Air-Conditioning System (HVAC) and Cold Water Sanitary Plumbing (CWSP) System. From 9 untill 13th April 2010, i will study the Lift System base on my schedule.
LIFT SYSTEM
Topics that i studied
- Introduction to the lift system.
- Users expectation on vertical transportation
- Relevant act and standards
- Categories of lifts
- Various speeds of lifts
- Location of lift
12 APRIL 2010
Continue study Lift System
- Types of lift systems
- Major lift components
- Safety features of a lift
- Design requirement
- Calculation of counter weight
Types of lift systems
• Hydraulic lift
• Electric / roped lift
13 APRIL 2010
Continue study Lift System
- Lift performance
- The number of lifts will have an effect on the quality of service
- Further criteria for the comfort and convenience of lift users
- A method for estimating and comparing efficiency and effectiveness of lift installation is by calculating the round trip time (rtt)
- Estimation of the interval and quality of service
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment